An organisation needs to resume operations within an hour of a site loss and can fund it. Which alternate site type fits?

  1. A hot site
  2. A warm site
  3. A cold site
  4. A mobile site
Show the answer

Answer: A. A hot site

Only a hot site is already running and able to take over almost immediately, at the highest cost.

Source: NIST SP 800-34 Rev. 1 (NIST) — SP 800-34 Rev. 1 § 3.4.2 Alternate Sites